Project Gallery

Chevron Duri

medco Energi

Total area 339.000 sq ft 
  • Coating for High Temperature Pipeline, 2008-2010
  • Coating Pressure Vesseland Underground Pipeline,2008-2009
  • Coating for Internal Pipeline, 2009
  • Coating Service forUnderground Pipe Crossing, 2010-2012
  • Coating Wash Tank CGS 3 & 4 DuriHeavy Oil Operation Unit, 2011
  • Coating Services for Pipe and Equipment, 2012-2015 (C830055)
  • Contract Extension Amendment (C830055), 2016
Total area 87.500 m2 2010-2011
  • Coating Pipeline &
  • Rig Emsco& Drecoin Rimau Area

Kondur Petroleum S A

Siemens petrobras

Area 12.000 m2 (2011-2012)
  • Blasting &
  • Coating Platform Maintenance in Kurau
TOTAL AREA 23.000 m2 (2015) 
  • E-house Module Blasting, 
  • Painting, & 
  • Inspection.

Leighton & Total Bangun Persada

Sinar Mas Oleochemical

New australian embassy patra kuningan jakarta, 2015 
  • spray cold insulation polyurethane foam total area 18.471 m2
  • spray polyurea waterproofing  total area20.854 m2
TOTAL AREA 5000 m2 (2016)
  • Spray waterproofing polyurea