Project Gallery
Chevron Duri
medco Energi
Total area 339.000 sq ft
- Coating for High Temperature Pipeline, 2008-2010
- Coating Pressure Vesseland Underground Pipeline,2008-2009
- Coating for Internal Pipeline, 2009
- Coating Service forUnderground Pipe Crossing, 2010-2012
- Coating Wash Tank CGS 3 & 4 DuriHeavy Oil Operation Unit, 2011
- Coating Services for Pipe and Equipment, 2012-2015 (C830055)
- Contract Extension Amendment (C830055), 2016
Total area 87.500 m2 2010-2011
- Coating Pipeline &
- Rig Emsco& Drecoin Rimau Area
Kondur Petroleum S A
Siemens petrobras
Area 12.000 m2 (2011-2012)
- Blasting &
- Coating Platform Maintenance in Kurau
TOTAL AREA 23.000 m2 (2015)
- E-house Module Blasting,
- Painting, &
- Inspection.
Leighton & Total Bangun Persada
Sinar Mas Oleochemical
New australian embassy patra kuningan jakarta, 2015
- spray cold insulation polyurethane foam total area 18.471 m2
- spray polyurea waterproofing total area20.854 m2
TOTAL AREA 5000 m2 (2016)
- Spray waterproofing polyurea